Jump to content
Gov  ·  Market  ·  Community  ·  Policies  ·  Funding  ·  Open Calls  ·  Get started

Gov/en/Portal:R&D/Open-Calls:Need-Driven-Funding-Criteria: Difference between revisions

From WikiDeal
Need gauge variable: about CHF 12,000/month (final per Théo 2026-08-18 22:34)
Tag: Manual revert
Move funding cluster to dedicated Category:Funding hub — per Théo 2026-08-18
 
Line 60: Line 60:
* [[Gov/en/Portal:R&D/Open-Calls:Under Study|Open Calls under study (Wave 2)]]
* [[Gov/en/Portal:R&D/Open-Calls:Under Study|Open Calls under study (Wave 2)]]


[[Category:Funding]]
[[Category:Innovation]]
[[Category:Innovation]]
[[Category:Economy]]
<!-- visible -->
<!-- visible -->

Latest revision as of 00:39, 19 August 2026

💡 In simple words: How much money does WikiDeal really need every month? This future call will ask everyone to help decide which costs are truly necessary and which ones are optional.


🎯 In 20 seconds (scientific summary): Draft open call, under construction, wave 2, not yet launched. It would define the criteria of the Need-Driven Funding gauge: the monthly amount considered as the real need, the distinction between incompressible costs and reducible or optional costs, and the provision target. The base hypothesis currently retained is CHF 12,000 per month; it is intended to evolve.


Open Call Status
Wave Second Wave (Draft)
Status Not launched yet
Members / Commission Undetermined (Under construction)
Chairperson TBD
Facilitator TBD

Open call: Need-Driven Funding criteria (draft, under construction)

Status Draft, under construction, not yet launched
Wave 2
Deadline To be defined at launch
Rewards To be defined

Question under study

The Need-Driven Funding mechanism adjusts the funding flow to the real need declared by the Ynternet.org Foundation. This draft call proposes to study the criteria behind that declared need:

  • What monthly amount should be considered as the real need? The base hypothesis currently retained is CHF 12,000 per month; this call would examine how that figure is established and reviewed.
  • Which costs are incompressible (costs that cannot be reduced without endangering operations, such as servers or core operating costs), and which costs are reducible or optional? For example, budgets attached to Open Calls are currently considered additional, not part of the incompressible base.
  • How many months of provision should the gauge target (currently proposed: 3 months)?
  • How and when should the gauge evolve (review frequency, who validates changes)?

These questions go in this tendency and are proposed as a basis for discussion; nothing is decided at this stage.

Status

This is a wave 2 draft: it is announced as an upcoming open call and is not yet launched. Scope, awards and deadline are intended to be defined at launch. The general rules of the Open Call would apply, in particular the rules of the game.

See also