Jump to content
Gov  ·  Market  ·  Community  ·  Policies  ·  Funding  ·  Open Calls  ·  Get started

Gov/en/Portal:Meta/Main: Difference between revisions

Highlight deliverables: link to Deliverables category (Theo 2026-08-03)
Rename Open Call to Open Calls; remove reputation credits (Theo 2026-08-03)
 
Line 39: Line 39:


* [[Gov/en/Portal:Meta/Prototype-1|Prototype 1]]: the '''parameters''' of the first version (funding target, bonding curve settings, phases). It describes what Prototype 1 is.
* [[Gov/en/Portal:Meta/Prototype-1|Prototype 1]]: the '''parameters''' of the first version (funding target, bonding curve settings, phases). It describes what Prototype 1 is.
* [[Gov/en/Portal:Meta/Prototype-1-Deliverables|Prototype 1 Deliverables]]: the '''commitments''' attached to the first CHF 1,000,000 funding round (an annex to the Funding Contract), organised in milestones. It describes what Prototype 1 must deliver, notably including the results of the [[Gov/en/Portal:R&D/Open-Call:Main#wave-2|wave 2 open calls]].
* [[Gov/en/Portal:Meta/Prototype-1-Deliverables|Prototype 1 Deliverables]]: the '''commitments''' attached to the first CHF 1,000,000 funding round (an annex to the Funding Contract), organised in milestones. It describes what Prototype 1 must deliver, notably including the results of the [[Gov/en/Portal:R&D/Open-Calls:Main#wave-2|wave 2 open calls]].
* [[Gov/en/Portal:Meta/Technical-Specs|Technical Specs]]: the technical specifications (starter page, to be expanded).
* [[Gov/en/Portal:Meta/Technical-Specs|Technical Specs]]: the technical specifications (starter page, to be expanded).
* [[:Category:Deliverables|Deliverables]]: all published deliverables and deliverable lists in one category (milestone lists, studies, annexes).
* [[:Category:Deliverables|Deliverables]]: all published deliverables and deliverable lists in one category (milestone lists, studies, annexes).