Gov/en/Portal:Meta/Main: Difference between revisions
Appearance
Highlight deliverables: link to Deliverables category (Theo 2026-08-03) |
Rename Open Call to Open Calls; remove reputation credits (Theo 2026-08-03) |
||
| Line 39: | Line 39: | ||
* [[Gov/en/Portal:Meta/Prototype-1|Prototype 1]]: the '''parameters''' of the first version (funding target, bonding curve settings, phases). It describes what Prototype 1 is. | * [[Gov/en/Portal:Meta/Prototype-1|Prototype 1]]: the '''parameters''' of the first version (funding target, bonding curve settings, phases). It describes what Prototype 1 is. | ||
* [[Gov/en/Portal:Meta/Prototype-1-Deliverables|Prototype 1 Deliverables]]: the '''commitments''' attached to the first CHF 1,000,000 funding round (an annex to the Funding Contract), organised in milestones. It describes what Prototype 1 must deliver, notably including the results of the [[Gov/en/Portal:R&D/Open- | * [[Gov/en/Portal:Meta/Prototype-1-Deliverables|Prototype 1 Deliverables]]: the '''commitments''' attached to the first CHF 1,000,000 funding round (an annex to the Funding Contract), organised in milestones. It describes what Prototype 1 must deliver, notably including the results of the [[Gov/en/Portal:R&D/Open-Calls:Main#wave-2|wave 2 open calls]]. | ||
* [[Gov/en/Portal:Meta/Technical-Specs|Technical Specs]]: the technical specifications (starter page, to be expanded). | * [[Gov/en/Portal:Meta/Technical-Specs|Technical Specs]]: the technical specifications (starter page, to be expanded). | ||
* [[:Category:Deliverables|Deliverables]]: all published deliverables and deliverable lists in one category (milestone lists, studies, annexes). | * [[:Category:Deliverables|Deliverables]]: all published deliverables and deliverable lists in one category (milestone lists, studies, annexes). | ||