Gov/en/Portal:R&D/Open-Calls:Deployment-Profiles: Difference between revisions
Shorten intros per Theo's 20s rule |
Add Open Call Status infobox per Theo |
||
| Line 3: | Line 3: | ||
{{ExpertIntro|Draft open call, under construction, wave 2, not yet launched. It would invite people matching the five profiles of the AI-supported deployment methodology (Prototyper, Builder, Sweeper, Grower, Maintainer) to participate in the definition, accompaniment and implementation of open calls and their results, as a pilot experience. Scope, awards and deadline are to be defined at launch.}} | {{ExpertIntro|Draft open call, under construction, wave 2, not yet launched. It would invite people matching the five profiles of the AI-supported deployment methodology (Prototyper, Builder, Sweeper, Grower, Maintainer) to participate in the definition, accompaniment and implementation of open calls and their results, as a pilot experience. Scope, awards and deadline are to be defined at launch.}} | ||
{| class="infobox" style="float: right; clear: right; margin: 0 0 1em 1em; width: 300px; font-size: 90%; background: #f9f9f9; border: 1px solid #aaa; padding: 0.2em;" | |||
! colspan="2" style="background: #ccf; text-align: center;" | Open Call Status | |||
|- | |||
! Wave | |||
| Second Wave (Draft) | |||
|- | |||
! Status | |||
| Not launched yet | |||
|- | |||
! Members / Commission | |||
| Undetermined (Under construction) | |||
|- | |||
! Chairperson | |||
| TBD | |||
|- | |||
! Facilitator | |||
| TBD | |||
|} | |||
__TOC__ | __TOC__ | ||
Latest revision as of 03:06, 9 August 2026
💡 In simple words: Building WikiDeal needs different helpers: people who imagine things, build them, simplify them, help them grow, and keep them running. One day WikiDeal intends to invite all of them. This page is a future call for ideas.
🎯 In 20 seconds (scientific summary): Draft open call, under construction, wave 2, not yet launched. It would invite people matching the five profiles of the AI-supported deployment methodology (Prototyper, Builder, Sweeper, Grower, Maintainer) to participate in the definition, accompaniment and implementation of open calls and their results, as a pilot experience. Scope, awards and deadline are to be defined at launch.
| Open Call Status | |
|---|---|
| Wave | Second Wave (Draft) |
| Status | Not launched yet |
| Members / Commission | Undetermined (Under construction) |
| Chairperson | TBD |
| Facilitator | TBD |
Open call: deployment profiles (draft, under construction)
| Status | Draft, under construction, not yet launched |
| Wave | 2 |
| Deadline | To be defined at launch |
| Awards | To be defined |
| How to propose | Not open yet |
What this call is intended to be about
This draft open call is intended to invite people matching the five profiles of the AI supported deployment methodology: Prototyper, Builder, Sweeper, Grower and Maintainer.
The methodology has been adopted by the R&D programme as an initial hypothesis, to be tested during Prototype 1. The intention, in the form of a pilot experience, is to invite these figures to participate in the definition, the accompaniment and the implementation of the open calls and of their results. The combination of the open call methodology with these five figures is the lever envisaged to move from idea to prototype and to deployment.
Open questions for this call
- How the five profiles would be identified and invited.
- How each profile would participate in the open calls and in their results.
- How the pilot experience would be evaluated.
Status
This is a wave 2 draft: it is announced as an upcoming open call and is not yet launched. Scope, awards and deadline are intended to be defined at launch. The general rules of the Open Call would apply, in particular the rules of the game.