WikiDeal:Minimum Viable Product: Difference between revisions
| Line 35: | Line 35: | ||
== Planing == | == Planing == | ||
# Preparing and submit the MVP proposal to NLnet (done, not to be funded) | # Preparing and submit the MVP proposal to NLnet (done, not to be funded) NB : all key-features for the Wikideal Minimum Viable product being interdependant, they will be developed in paralel, together, following the same planing. | ||
# '''Users Needs analysis with experts.''' | # '''Users Needs analysis with experts.''' | ||
#: '''a) Design activities:''' developing basic wireframes to visualize the layout and flow of the MVP and defining user stories to outline the expected user interactions. Including meeting to design and adapt: | #: '''a) Design activities:''' developing basic wireframes to visualize the layout and flow of the MVP and defining user stories to outline the expected user interactions. Including meeting to design and adapt: | ||